
What happens
between deposit and delivery.
Foshan is China's aluminium extrusion and outdoor-living manufacturing hub. Your order is produced there, checked at each stage, and documented with photos before it leaves.
Six checkpoints. Photographed.
You receive photos and readings from each checkpoint — not just a “passed” stamp.
Profiles in
Alloy and wall thickness of incoming extrusions measured against the drawing.
Machining
Cut lengths, holes and joint fit checked on the first pieces of each batch.
Coating
Colour against the approved RAL chip and coating thickness readings on each colour batch.
Function test
Motor, remote, sensor and louvre rotation tested; LEDs and screens powered up.
Packing
Every part counted against the packing list, labelled by set, foam-wrapped and cartoned.
Loading
Container photographed at empty, half, full and sealed, with the seal number recorded.
Want your own inspection? Third-party inspectors (SGS, Bureau Veritas, QIMA or your agent) are welcome before shipment.

Packed for a long sea voyage.
- Protected profiles. Each coated profile foam-wrapped, then cartoned; long beams in wooden crates or on pallets.
- Labelled by set. Every carton labelled with set number and contents, so your installer finds parts fast.
- Loading plan. Container loading plan with every quote — you know how many sets fit before you order.
- Export documents. Commercial invoice, packing list and bill of lading; certificate of origin and other documents on request.
Trade terms, in plain words.
Everything below is stated again on your quotation.
| Incoterms | FOB Foshan / Guangzhou (Nansha) as standard. CIF to your port or DDP to your door on request. |
|---|---|
| Payment | 30% T/T deposit with order confirmation, 70% T/T against copy of the B/L. |
| Production time | Typically 25–35 days after deposit and approved drawing. |
| Containers | 20GP, 40GP, 40HQ, or LCL for trial orders. Mixed products allowed. |
| Currency | USD (EUR on request). |
Typical sea transit from South China
| Destination | Typical transit | Main ports |
|---|---|---|
| Middle East | 15–25 days | Jebel Ali, Dammam, Hamad, Shuwaikh |
| Australia / NZ | 15–25 days | Sydney, Melbourne, Brisbane, Auckland |
| US West Coast | 15–25 days | Los Angeles, Long Beach, Oakland |
| Europe | 30–40 days | Rotterdam, Hamburg, Antwerp, Valencia |
| US East Coast | 30–40 days | New York, Savannah, Houston |
Port-to-port estimates; actual schedules vary by carrier and season. Your quotation includes a current estimate.
Have a drawing or just a photo of the space?
Send it over. You will get a price per set, a layout drawing and the lead time — usually within one working day.
Send your sizes.
Get a price and a drawing.
Tell us the size, the quantity and the market. You get a price, a lead time and a layout drawing — no account, no login, no newsletter.
- [email protected]
- +86 131 2826 5916
- +86 131 2826 5916
- Response
- Within 24 hours, Monday–Saturday (GMT+8)
- Production
- Foshan, Guangdong, China